As part of the wider Hong Kong–Zhuhai-Macau Bridge project, the Hong Kong SAR Highways Department needed to design and construct the section of Hong Kong Link Road (HKLR) between Scenic Hill and the Hong Kong Boundary Crossing Facilities (HKBCF), and road links between the HKBCF and Hong Kong International Airport.
Arup was heavily involved in the feasibility study, design and delivery of the HKLR, which connects the main bridge of the Hong Kong-Zhuhai-Macau Bridge with the HKBCF on an artificial island at the north-eastern waters of the Airport Island, opening a direct connection between Hong Kong, Macau and the Western Pearl River Delta Region.
We worked on the dual 3-lane expressway which comprises a 9.4km viaduct section, a 1km long tunnel as well as a 1.6km long at-grade road section on reclaimed land.
These mega structures were designed to be resilient, and built to last 120 years in accordance with design standards, and capable of withstanding extreme events such as earthquakes and typhoons.
Non-dredged reclamation
We proposed a non-dredged construction method for the seawall and reclamation which provides 23ha land area for accommodating the tunnel eastern portal and the at-grade section of the HKLR, associated maintenance facilities and the connection roads between the HKBCF and the Hong Kong International Airport.
Compared with the conventional fully-dredged method, the non-dredged approach minimises sediment dredging and disposal as well as impact on the overall water quality. After looking into various non-dredged methods and their site and environmental constraints, stone column-supported seawall and band drains with surcharge reclamation was finally adopted.
Scenic Hill Tunnel
The HKLR includes a tunnel section which passes through the Scenic Hill, underneath the Airport Road and Airport Express Line (AEL) railway on the Airport Island to minimise environmental and visual impacts to Tung Chung residents. The complex and varied ground properties led to different construction methods for the 1km long tunnel: drill and blast for the Scenic Hill section given the hardness of the rock, mining method for the Airport Road section to maintain the road traffic during tunnelling, whole tunnel box jacking for the AEL section to meet the stringent differential settlement requirements for the railway tracks, and open cut and cover for the new reclamation section with fewer constraints.